AC Installation Done the Way the Manual Says

A new condenser bolted onto a duct system that can't move the air is a warranty claim waiting to happen. We treat installation as a system decision: load, equipment, ducts, refrigerant, and commissioning.

Load calculation before equipment selection

We use a Manual J-style room-by-room load — orientation, insulation, glass, infiltration — instead of matching the sticker on the old unit. Oversized systems short-cycle, dehumidify poorly, and wear out early.

Ducts and airflow first

Before we quote equipment we measure static pressure and evaluate the duct system. If the ducts can't deliver rated CFM at the coil, we tell you — and give you options to correct or replace duct before installation, not after.

Commissioning is part of the install

Every install is commissioned: refrigerant weighed in, subcooling verified, blower speed set to design CFM, temperature split confirmed, and readings written on the sticker inside the air handler. That paperwork is the difference between an install and a swap.

What's included

  • Manual J-style load calculation
  • Duct static pressure verified pre- and post-install
  • Refrigerant weighed and commissioning documented
  • R-32 and R-410A equipment options explained plainly